PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing Stair -3 at the 3rd floor Facing East.jpg Installed exhaust fans at the 1st floor Facing South.jpg Installed junction boxes outside Stairwell -4 Facing East.jpg Installing bathroom carriers at 2nd Floor bathroom 242 Facing North.jpg Installing waste piping at the 2nd floor bathrooms Facing South.jpg Laying out block at the 1st floor Attorneys Rooms Facing East.jpg Sheathing the parapet at along the perimeter of the high roof Facing north.jpg Stone panel aligning around the skylight Facing North.jpg Waste and vent piping at 2nd floor bathrooms 227-228 Facing South.jpg
Previous pageNext page Installing waste piping at the 2nd floor bathrooms Facing South
Installing waste piping at the 2nd floor bathrooms Facing South